Odyssey Gold has reported high-grade gold intersections from reverse-circulation drilling west of the Cable deposit at its Tuckanarra Gold Project in Western Australia's Murchison region.
The 10 September 2026 results cover 18 holes for 1,367 metres from a recently completed 20,000-metre program. They have confirmed bedrock mineralisation at the Argos lode and identified another high-grade structure between Argos and the main Cable deposit.
Multiple lodes emerge west of Cable
Hole CBRC0451 returned 5 metres at 16.1 grams per tonne gold from 30 metres, including 2 metres at 36.7 grams per tonne. The same hole intersected 9 metres at 6.8 grams per tonne from 99 metres, including separate one-metre intervals at 21.9 and 23.7 grams per tonne.
Argos results included 5 metres at 6.7 grams per tonne from 18 metres, including 2 metres at 14.3 grams per tonne, while other intersections included 11 metres at 2.4 grams per tonne from 72 metres and 7 metres at 2.6 grams per tonne from 42 metres.
Follow-up drilling before mine planning
The drilling indicates a broader system of sub-parallel lodes extending west of the current Cable mineral resource. Odyssey plans to test the structures along strike and down dip and integrate the results into updated geological and resource models.
A further 60 holes from the wider program remain pending. The company is also reviewing the timing of its Stage 1 feasibility study so that new results and follow-up drilling can be incorporated into resource and mine-planning work. Tuckanarra currently has indicated and inferred resources of 6.3 million tonnes at 2.2 grams per tonne gold for 451,000 ounces.
Source: Odyssey Gold Limited, “High-Grade Results Expand Cable West and New Argos Lode”, 10 September 2026.