KKDD001 returned 54.0m of sampled core from 43.0m with a 38.5% length-weighted mass recovery and 71.0% Fe magnetic concentrate grade. KKDD004, drilled about 600m south of the current resource boundary, returned 51.4m from 112.6m with a 43.1% mass recovery and 71.0% Fe concentrate grade. The reported lengths are down-hole lengths; true width is not known for individual composites.
The company said the current JORC Inferred Mineral Resource is 110Mt at a 69% Fe concentrate grade and is defined over about 5km of strike. It cautioned that the DTR results are laboratory-scale composite results, do not change the current resource estimate, and drilling spacing is insufficient to establish continuity for resource estimation. Results for seven further completed diamond holes remain pending.
Source: Download KLI official ASX announcement, 2026-11-25.
Photograph from Killi Resources' 25 November 2026 announcement, captioned as RC drilling at the Lodestone Iron Ore Project.