Sigma Lithium said it presented results from the circular cleantech model at its Grota do Cirilo operation in Minas Gerais, Brazil, at COP31 in Antalya, Türkiye. The company said the plant industrializes 23% more lithium from the same ore mined and stores tailings without dams.
The company said it reprocesses dry-stacked tailings fines to generate additional revenue from high-grade and low-grade lithium fines without additional mining. It also reported reusing 90% of its water and said it had recorded more than 1,190 consecutive days without a lost-time injury as of November 10, 2026.
Responding to media reports, Sigma Lithium denied the reports and said its mining rights and concessions are in good standing with Brazil's National Mining Agency and other competent authorities. The company said the matter is being addressed through regular procedures under Brazilian law.
Sigma Lithium said it has nameplate capacity to industrialize 330,000 tonnes of lithium oxide concentrate annually. The company plans to resume its Phase 2 expansion in 2027, which it says is designed to nearly double annual capacity to 580,000 tonnes, followed by a planned Phase 3 expansion to 830,000 tonnes.
Source: Download SAU official ASX announcement, 2026-11-20.
Sigma Lithium's industrial plant shown in the company's announcement dated November 19, 2026.