13 May 2026 | Western Australia - Tungsten Mining NL has commenced on-site preparation works at its 100%-owned Mt Mulgine Project in Western Australia, ahead of a major RC and diamond drilling program at the Mulgine Trench deposit.
The company said current site activities include drill pad preparation, surveying, drill hole mark-out, support infrastructure groundworks, site access preparation and safety work required before drilling can begin.
The planned RC drilling campaign will include 130 holes for 40,000 metres at Mulgine Trench. The program is designed to test the continuity of extensions beneath the 2020 Mineral Resource Estimate, targeting an additional 80 metres to 160 metres down-dip. Assay results are expected to be released periodically, approximately six weeks after drilling commences.