Metallurgy

MP12000 Commissioning Plant Metallurgists

MES is currently looking for two Plant Metallurgists to join the commissioning team at our client's Australian based operation.

This is offered as a 3 month contract with an extension option and working on a 16:12 roster.

  • Base metal flotation
  • Minimum of 3 years operational experience
  • Strong trouble shooting skills
  • Previous commissioning highly regarded

The successful candidates will be offered an attractive day rate working on a major project within the Australian Mining Sector.

About the role: 
  • Commissioning Opportunity
  • Negotiable day rate
  • Fantastic Roster
Experience: 
Minimum 3 years in a base metal operation
Current Status: 
OPEN
Duration: 
Contract
Location: 
Queensland
Duty Roster: 
16:12 FIFO
Hello I'm Mark Pemberton

 

 

 

📞+61 8 9240 7399
Files must be less than 2 MB.
Allowed file types: pdf doc docx.
Files must be less than 2 MB.
Allowed file types: pdf doc docx.
Please enter your Linkedin Public Profile URL if you have one.